Files
ForgeLM/.planning/STATE.md
T

99 lines
4.5 KiB
Markdown

---
gsd_state_version: 1.0
milestone: v1.0
milestone_name: milestone
status: verifying
stopped_at: Completed Phase 3 - Unified Runtime Workspace
last_updated: "2026-03-29T20:49:43.441Z"
last_activity: 2026-03-29
progress:
total_phases: 4
completed_phases: 3
total_plans: 9
completed_plans: 9
percent: 50
---
# Project State
## Project Reference
See: `.planning/PROJECT.md` (updated 2026-03-28)
**Core value:** A user can configure and operate the runtime from one trustworthy workspace without the UI fighting their in-progress edits.
**Current focus:** Phase 3 - Unified Runtime Workspace
## Current Position
Phase: 3 of 4 (Unified Runtime Workspace)
Plan: 3 of 3 authored for current phase
Status: Phase complete — ready for verification
Last activity: 2026-03-29
Progress: [█████░░░░░] 50%
## Performance Metrics
**Velocity:**
- Total plans completed: 6
- Average duration: 13min
- Total execution time: 1.3 hours
**By Phase:**
| Phase | Plans | Total | Avg/Plan |
|-------|-------|-------|----------|
| 01 | 3 | 46min | 15min |
| 02 | 3 | 33min | 11min |
**Recent Trend:**
- Last 5 plans: 02-03 (13min), 02-02 (14min), 02-01 (6min), 01-03 (18min), 01-02 (18min)
- Trend: Improving
| Phase 01 P01 | 10min | 2 tasks | 4 files |
| Phase 01 P02 | 18min | 2 tasks | 4 files |
| Phase 01 P03 | 18min | 2 tasks | 5 files |
| Phase 02-lifecycle-command-safety P01 | 6min | 2 tasks | 3 files |
| Phase 02-lifecycle-command-safety P02 | 14min | 2 tasks | 5 files |
| Phase 02-lifecycle-command-safety P03 | 13min | 2 tasks | 7 files |
## Accumulated Context
### Decisions
Decisions are logged in PROJECT.md Key Decisions table.
Recent decisions affecting current work:
- Phase 1 starts with state ownership fixes before UI consolidation to eliminate poll-driven draft overwrites first.
- This milestone stays brownfield and must preserve working lifecycle, model selection, and chat flows while improving runtime workspace trust.
- [Phase 01]: Kept legacy snapshot and saveConfig outputs while adding explicit draft APIs so existing runtime drawer consumers keep compiling during the Phase 1 transition.
- [Phase 01]: When a runtime draft is dirty, polling updates only operational live fields and leaves baseline plus draft config untouched.
- [Phase 02-lifecycle-command-safety]: Expose active and last lifecycle command data on RuntimeSnapshot so frontend polling can render trustworthy lifecycle feedback without inferring from status alone.
- [Phase 02-lifecycle-command-safety]: Centralize duplicate start/stop blocking in runtime state helpers so save, start, and stop flows share the same command-result contract.
- [Phase 02-lifecycle-command-safety]: Keep restart-required save enforcement limited to connection_mode, model_path, addr, gpu_layers, and ctx_size to stay aligned with the existing backend runtime boundary.
- [Phase 02-lifecycle-command-safety]: Mirror backend lifecycle metadata directly into the frontend RuntimeSnapshot so polling and command responses share one contract.
- [Phase 02-lifecycle-command-safety]: Derive applyImpact from saved baseline versus draft config using the backend restart-required field list instead of UI-only heuristics.
- [Phase 02-lifecycle-command-safety]: Expose activeLifecycleCommand, lastLifecycleResult, and lifecycleBusy from the manager so status-card and drawer copy can consume explicit state in plan 02-03.
- [Phase 02-lifecycle-command-safety]: Use explicit lifecycle result banners instead of overloading last_error so completed and blocked actions remain visible after polling refreshes.
- [Phase 02-lifecycle-command-safety]: Render apply guidance in the drawer before the CTA row so users see whether a draft applies immediately, needs restart, or must be saved before apply.
- [Phase 02-lifecycle-command-safety]: Keep status-card and drawer props backward-compatible with optional lifecycle fields while Sidebar forwards the new manager contract.
- [Phase 03-01]: Reuse existing restart-impact field list and lifecycle labels instead of creating parallel heuristics
- [Phase 03-01]: Derive diagnostics from backend-owned snapshot fields (status, ready, process_running, resolved_url, config.*, binary_path, last_error)
- [Phase 03-03]: One authoritative runtime workspace in sidebar shell - RuntimeWorkspace replaces split StatusCard + Drawer flow
### Pending Todos
None yet.
### Blockers/Concerns
- None currently; Phase 3 can build on the now-stable lifecycle/apply contract.
## Session Continuity
Last session: 2026-03-29T20:49:43.436Z
Stopped at: Completed Phase 3 - Unified Runtime Workspace
Resume file: None