- Check process_running and ready state before making inference request
- Emit descriptive error messages for each failure scenario
- Handle local vs remote connection modes appropriately
- Validation score: 100 (was 0)
Result: {"status":"keep","validation_score":100,"response_time_ms":500}
6.0 KiB
gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
| gsd_state_version | milestone | milestone_name | status | stopped_at | last_updated | last_activity | progress | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.0 | v1.0 | milestone | active | Completed Phase 6 - Chat UI Redesign | 2026-04-02T12:20:00.000Z | 2026-04-02 |
|
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-03-28)
Core value: A user can configure and operate the runtime from one trustworthy workspace without the UI fighting their in-progress edits. Current focus: Phase 6 complete — milestone state needs final audit because ROADMAP top-level phase ordering was stale.
Current Position
Phase: 6 of 6 (Chat UI Redesign) Plan: 4 of 4 completed for current phase Status: Phase complete — verified Last activity: 2026-04-02 - Completed Manus-style agentic transcript blocks and Tauri event bridge scaffold
Progress: [███████░░░] 75%
Performance Metrics
Velocity:
- Total plans completed: 12
- Average duration: 13min
- Total execution time: ~2.6 hours
By Phase:
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| 01 | 3 | 46min | 15min |
| 02 | 3 | 33min | 11min |
| 03 | 3 | 39min | 13min |
| 04 | 3 | 45min | 15min |
Recent Trend:
- Last 5 plans: 04-03 (15min), 04-02 (15min), 04-01 (15min), 03-03 (13min), 03-02 (13min)
- Trend: Stable
| Phase 01 P01 | 10min | 2 tasks | 4 files | | Phase 01 P02 | 18min | 2 tasks | 4 files | | Phase 01 P03 | 18min | 2 tasks | 5 files | | Phase 02-lifecycle-command-safety P01 | 6min | 2 tasks | 3 files | | Phase 02-lifecycle-command-safety P02 | 14min | 2 tasks | 5 files | | Phase 02-lifecycle-command-safety P03 | 13min | 2 tasks | 7 files | | Phase 03-unified-runtime-workspace P01 | 13min | 2 tasks | 4 files | | Phase 03-unified-runtime-workspace P02 | 13min | 2 tasks | 5 files | | Phase 03-unified-runtime-workspace P03 | 13min | 2 tasks | 6 files | | Phase 04-hf-download-engine P01 | 15min | 2 tasks | 3 files | | Phase 04-hf-download-engine P02 | 15min | 2 tasks | 3 files | | Phase 04-hf-download-engine P03 | 15min | 2 tasks | 4 files |
Accumulated Context
Decisions
Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:
- Phase 1 starts with state ownership fixes before UI consolidation to eliminate poll-driven draft overwrites first.
- This milestone stays brownfield and must preserve working lifecycle, model selection, and chat flows while improving runtime workspace trust.
- [Phase 01]: Kept legacy snapshot and saveConfig outputs while adding explicit draft APIs so existing runtime drawer consumers keep compiling during the Phase 1 transition.
- [Phase 01]: When a runtime draft is dirty, polling updates only operational live fields and leaves baseline plus draft config untouched.
- [Phase 02-lifecycle-command-safety]: Expose active and last lifecycle command data on RuntimeSnapshot so frontend polling can render trustworthy lifecycle feedback without inferring from status alone.
- [Phase 02-lifecycle-command-safety]: Centralize duplicate start/stop blocking in runtime state helpers so save, start, and stop flows share the same command-result contract.
- [Phase 02-lifecycle-command-safety]: Keep restart-required save enforcement limited to connection_mode, model_path, addr, gpu_layers, and ctx_size to stay aligned with the existing backend runtime boundary.
- [Phase 02-lifecycle-command-safety]: Mirror backend lifecycle metadata directly into the frontend RuntimeSnapshot so polling and command responses share one contract.
- [Phase 02-lifecycle-command-safety]: Derive applyImpact from saved baseline versus draft config using the backend restart-required field list instead of UI-only heuristics.
- [Phase 02-lifecycle-command-safety]: Expose activeLifecycleCommand, lastLifecycleResult, and lifecycleBusy from the manager so status-card and drawer copy can consume explicit state in plan 02-03.
- [Phase 02-lifecycle-command-safety]: Use explicit lifecycle result banners instead of overloading last_error so completed and blocked actions remain visible after polling refreshes.
- [Phase 02-lifecycle-command-safety]: Render apply guidance in the drawer before the CTA row so users see whether a draft applies immediately, needs restart, or must be saved before apply.
- [Phase 02-lifecycle-command-safety]: Keep status-card and drawer props backward-compatible with optional lifecycle fields while Sidebar forwards the new manager contract.
- [Phase 03-01]: Reuse existing restart-impact field list and lifecycle labels instead of creating parallel heuristics
- [Phase 03-01]: Derive diagnostics from backend-owned snapshot fields (status, ready, process_running, resolved_url, config.*, binary_path, last_error)
- [Phase 03-03]: One authoritative runtime workspace in sidebar shell - RuntimeWorkspace replaces split StatusCard + Drawer flow
- [Phase 04-hf-download-engine]: Download runs in Rust (not JS) to avoid IPC bottlenecks for multi-GB GGUF files; progress emitted via Tauri events.
- [Phase 04-hf-download-engine]: Direct resolve URL
https://huggingface.co/{repo}/resolve/main/{fileName}used for downloads; bearer token applied when available. - [Phase 04-hf-download-engine]: React hook
useModelDownloadwraps Tauri invoke/listen for clean component consumption. - [Phase 04-hf-download-engine]:
.sp-hf-fileclass added to HF file rows for progress-bar state integration.
Pending Todos
None yet.
Blockers/Concerns
- ROADMAP top-level phase completion still needs milestone audit because Phase 5 summary and top checklist are out of sync.
Quick Tasks Completed
| # | Description | Date | Commit | Directory |
|---|---|---|---|---|
| 1 | Investigar e corrigir bug de internal error na segunda mensagem do chat | 2026-03-30 | abb9db0 |
1-investigar-e-corrigir-bug-de-internal-er |
Session Continuity
Last session: 2026-03-31T00:25:00.000Z Stopped at: Completed Phase 4 - Hugging Face Download Engine Resume file: None