Files
ForgeLM/.planning/STATE.md

4.9 KiB

gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
gsd_state_version milestone milestone_name status stopped_at last_updated last_activity progress
1.0 v1.0 milestone verifying Completed Phase 3 - Unified Runtime Workspace 2026-03-29T20:49:43.441Z 2026-03-29
total_phases completed_phases total_plans completed_plans percent
4 3 9 9 50

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-03-28)

Core value: A user can configure and operate the runtime from one trustworthy workspace without the UI fighting their in-progress edits. Current focus: Phase 3 - Unified Runtime Workspace

Current Position

Phase: 3 of 4 (Unified Runtime Workspace) Plan: 3 of 3 authored for current phase Status: Phase complete — ready for verification Last activity: 2026-03-30 - Completed quick task 1: Investigar e corrigir bug de internal error na segunda mensagem do chat

Progress: [█████░░░░░] 50%

Performance Metrics

Velocity:

  • Total plans completed: 6
  • Average duration: 13min
  • Total execution time: 1.3 hours

By Phase:

Phase Plans Total Avg/Plan
01 3 46min 15min
02 3 33min 11min

Recent Trend:

  • Last 5 plans: 02-03 (13min), 02-02 (14min), 02-01 (6min), 01-03 (18min), 01-02 (18min)
  • Trend: Improving

| Phase 01 P01 | 10min | 2 tasks | 4 files | | Phase 01 P02 | 18min | 2 tasks | 4 files | | Phase 01 P03 | 18min | 2 tasks | 5 files | | Phase 02-lifecycle-command-safety P01 | 6min | 2 tasks | 3 files | | Phase 02-lifecycle-command-safety P02 | 14min | 2 tasks | 5 files | | Phase 02-lifecycle-command-safety P03 | 13min | 2 tasks | 7 files |

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:

  • Phase 1 starts with state ownership fixes before UI consolidation to eliminate poll-driven draft overwrites first.
  • This milestone stays brownfield and must preserve working lifecycle, model selection, and chat flows while improving runtime workspace trust.
  • [Phase 01]: Kept legacy snapshot and saveConfig outputs while adding explicit draft APIs so existing runtime drawer consumers keep compiling during the Phase 1 transition.
  • [Phase 01]: When a runtime draft is dirty, polling updates only operational live fields and leaves baseline plus draft config untouched.
  • [Phase 02-lifecycle-command-safety]: Expose active and last lifecycle command data on RuntimeSnapshot so frontend polling can render trustworthy lifecycle feedback without inferring from status alone.
  • [Phase 02-lifecycle-command-safety]: Centralize duplicate start/stop blocking in runtime state helpers so save, start, and stop flows share the same command-result contract.
  • [Phase 02-lifecycle-command-safety]: Keep restart-required save enforcement limited to connection_mode, model_path, addr, gpu_layers, and ctx_size to stay aligned with the existing backend runtime boundary.
  • [Phase 02-lifecycle-command-safety]: Mirror backend lifecycle metadata directly into the frontend RuntimeSnapshot so polling and command responses share one contract.
  • [Phase 02-lifecycle-command-safety]: Derive applyImpact from saved baseline versus draft config using the backend restart-required field list instead of UI-only heuristics.
  • [Phase 02-lifecycle-command-safety]: Expose activeLifecycleCommand, lastLifecycleResult, and lifecycleBusy from the manager so status-card and drawer copy can consume explicit state in plan 02-03.
  • [Phase 02-lifecycle-command-safety]: Use explicit lifecycle result banners instead of overloading last_error so completed and blocked actions remain visible after polling refreshes.
  • [Phase 02-lifecycle-command-safety]: Render apply guidance in the drawer before the CTA row so users see whether a draft applies immediately, needs restart, or must be saved before apply.
  • [Phase 02-lifecycle-command-safety]: Keep status-card and drawer props backward-compatible with optional lifecycle fields while Sidebar forwards the new manager contract.
  • [Phase 03-01]: Reuse existing restart-impact field list and lifecycle labels instead of creating parallel heuristics
  • [Phase 03-01]: Derive diagnostics from backend-owned snapshot fields (status, ready, process_running, resolved_url, config.*, binary_path, last_error)
  • [Phase 03-03]: One authoritative runtime workspace in sidebar shell - RuntimeWorkspace replaces split StatusCard + Drawer flow

Pending Todos

None yet.

Blockers/Concerns

  • None currently; Phase 3 can build on the now-stable lifecycle/apply contract.

Quick Tasks Completed

# Description Date Commit Directory
1 Investigar e corrigir bug de internal error na segunda mensagem do chat 2026-03-30 abb9db0 1-investigar-e-corrigir-bug-de-internal-er

Session Continuity

Last session: 2026-03-29T20:49:43.436Z Stopped at: Completed Phase 3 - Unified Runtime Workspace Resume file: None