| Verify phase - run full validation suite |
Phase 4: Verify
Purpose
Run all linters, static analysis, and tests to ensure code quality.
Note: Paths below follow the project structure defined in
project-structure.md. Adjust paths to match the actual project layout (e.g.apps/backend,apps/frontend).
Phase 3 Gate
- Were any storage/database adapter files modified? List them: ___
- Were any external API adapters modified? List them: ___
- If YES to either: are integration tests written and passing?
- If NO to both: state why Phase 3 was skipped
CRITICAL: If you modified
*_pg.go,*_integration*.go, or any SQL query, Phase 3 is MANDATORY. Do not proceed without integration tests.
Phase 3.5 Gate
- Were any UI changes or modified? List them: ___
- If YES: are E2E tests written and passing?
- If NO to both: state why Phase 3.5 was skipped
CRITICAL: If you modified
frontend/*or any frontend component and integration point, Phase 3.5 is MANDATORY. Do not proceed without E2E tests.
If This Phase Fails
If lint/test/build fails:
- Do not proceed to Ship
- Fix the issue (go back to Phase 2 or 3 as needed)
- Re-run full verification
- Only proceed when ALL checks pass
Steps
Set Mode: Use task_boundary to set mode to VERIFICATION.
1. Backend Validation
Run the FULL validation suite for the backend path as defined in project-structure.md:
# // turbo
# Adjust path per project-structure.md (default: apps/backend)
cd apps/backend && gofumpt -l -e -w . && go vet ./... && staticcheck ./... && gosec -quiet ./... && go test -race ./...
2. Frontend Validation
# // turbo
# Adjust path per project-structure.md (default: apps/frontend)
cd apps/frontend && pnpm run lint --fix && npx vue-tsc --noEmit && pnpm run test
3. Build Check
# Backend (path per project-structure.md)
cd apps/backend && go build ./...
# Frontend (path per project-structure.md)
cd apps/frontend && pnpm run build
4. Check Coverage
Report actual coverage in task summary.
Go:
go test -cover ./internal/features/...
Frontend:
pnpm run test -- --coverage
Completion Criteria
- All lint checks pass
- All tests pass
- Build succeeds
- Coverage reported (target >85% on domain logic)
On Success
Mark task as [x] in task.md (verification passed = task complete).
Next Phase