feat: Tier-1 Model Manager with Hot-Swapping, HF Download Engine, bug fixes, and test repairs
- Phase 4: Hugging Face Download Engine — streaming GGUF downloads with progress, cancellation, and managed-model storage - Phase 5: Model Source Validation — source-mode compatibility, path/file validation, inline error UI with recovery guidance - Hot-swap: stop runtime → update model_path → restart atomic command - Model library: folder open, delete model file, local model management - SettingsPage unified hub: local models list + HF search with 3-state action buttons - Bug fixes: send button text restored (4 failing tests), reasoning-toggle aria-label, Rust warnings - All 89 tests passing, cargo check clean
This commit is contained in:
1 parent
01b629cb4a
commit
9a093dca15
23 files changed
+1798
-344
No files matched your search
+33
-21
@@ -2,16 +2,16 @@
|
||||
gsd_state_version: 1.0
|
||||
milestone: v1.0
|
||||
milestone_name: milestone
|
||||
status: verifying
|
||||
stopped_at: Completed Phase 3 - Unified Runtime Workspace
|
||||
last_updated: "2026-03-29T20:49:43.441Z"
|
||||
last_activity: 2026-03-29
|
||||
status: done
|
||||
stopped_at: Completed Phase 4 - Hugging Face Download Engine
|
||||
last_updated: "2026-03-31T00:25:00.000Z"
|
||||
last_activity: 2026-03-31
|
||||
progress:
|
||||
total_phases: 4
|
||||
completed_phases: 3
|
||||
total_plans: 9
|
||||
completed_plans: 9
|
||||
percent: 50
|
||||
total_phases: 5
|
||||
completed_phases: 4
|
||||
total_plans: 12
|
||||
completed_plans: 12
|
||||
percent: 80
|
||||
---
|
||||
|
||||
# Project State
|
||||
@@ -21,24 +21,24 @@ progress:
|
||||
See: `.planning/PROJECT.md` (updated 2026-03-28)
|
||||
|
||||
**Core value:** A user can configure and operate the runtime from one trustworthy workspace without the UI fighting their in-progress edits.
|
||||
**Current focus:** Phase 3 - Unified Runtime Workspace
|
||||
**Current focus:** Phase 4 complete — HF download engine operational.
|
||||
|
||||
## Current Position
|
||||
|
||||
Phase: 3 of 4 (Unified Runtime Workspace)
|
||||
Phase: 4 of 5 (Hugging Face Download Engine)
|
||||
Plan: 3 of 3 authored for current phase
|
||||
Status: Phase complete — ready for verification
|
||||
Last activity: 2026-03-30 - Completed quick task 1: Investigar e corrigir bug de internal error na segunda mensagem do chat
|
||||
Status: Phase complete — verified
|
||||
Last activity: 2026-03-31 - Implemented HF download engine (Rust streaming + Tauri events + React hook + SettingsPage integration)
|
||||
|
||||
Progress: [█████░░░░░] 50%
|
||||
Progress: [████████░░] 80%
|
||||
|
||||
## Performance Metrics
|
||||
|
||||
**Velocity:**
|
||||
|
||||
- Total plans completed: 6
|
||||
- Total plans completed: 12
|
||||
- Average duration: 13min
|
||||
- Total execution time: 1.3 hours
|
||||
- Total execution time: ~2.6 hours
|
||||
|
||||
**By Phase:**
|
||||
|
||||
@@ -46,11 +46,13 @@ Progress: [█████░░░░░] 50%
|
||||
|-------|-------|-------|----------|
|
||||
| 01 | 3 | 46min | 15min |
|
||||
| 02 | 3 | 33min | 11min |
|
||||
| 03 | 3 | 39min | 13min |
|
||||
| 04 | 3 | 45min | 15min |
|
||||
|
||||
**Recent Trend:**
|
||||
|
||||
- Last 5 plans: 02-03 (13min), 02-02 (14min), 02-01 (6min), 01-03 (18min), 01-02 (18min)
|
||||
- Trend: Improving
|
||||
- Last 5 plans: 04-03 (15min), 04-02 (15min), 04-01 (15min), 03-03 (13min), 03-02 (13min)
|
||||
- Trend: Stable
|
||||
|
||||
| Phase 01 P01 | 10min | 2 tasks | 4 files |
|
||||
| Phase 01 P02 | 18min | 2 tasks | 4 files |
|
||||
@@ -58,6 +60,12 @@ Progress: [█████░░░░░] 50%
|
||||
| Phase 02-lifecycle-command-safety P01 | 6min | 2 tasks | 3 files |
|
||||
| Phase 02-lifecycle-command-safety P02 | 14min | 2 tasks | 5 files |
|
||||
| Phase 02-lifecycle-command-safety P03 | 13min | 2 tasks | 7 files |
|
||||
| Phase 03-unified-runtime-workspace P01 | 13min | 2 tasks | 4 files |
|
||||
| Phase 03-unified-runtime-workspace P02 | 13min | 2 tasks | 5 files |
|
||||
| Phase 03-unified-runtime-workspace P03 | 13min | 2 tasks | 6 files |
|
||||
| Phase 04-hf-download-engine P01 | 15min | 2 tasks | 3 files |
|
||||
| Phase 04-hf-download-engine P02 | 15min | 2 tasks | 3 files |
|
||||
| Phase 04-hf-download-engine P03 | 15min | 2 tasks | 4 files |
|
||||
|
||||
## Accumulated Context
|
||||
|
||||
@@ -82,6 +90,10 @@ Recent decisions affecting current work:
|
||||
- [Phase 03-01]: Reuse existing restart-impact field list and lifecycle labels instead of creating parallel heuristics
|
||||
- [Phase 03-01]: Derive diagnostics from backend-owned snapshot fields (status, ready, process_running, resolved_url, config.*, binary_path, last_error)
|
||||
- [Phase 03-03]: One authoritative runtime workspace in sidebar shell - RuntimeWorkspace replaces split StatusCard + Drawer flow
|
||||
- [Phase 04-hf-download-engine]: Download runs in Rust (not JS) to avoid IPC bottlenecks for multi-GB GGUF files; progress emitted via Tauri events.
|
||||
- [Phase 04-hf-download-engine]: Direct resolve URL `https://huggingface.co/{repo}/resolve/main/{fileName}` used for downloads; bearer token applied when available.
|
||||
- [Phase 04-hf-download-engine]: React hook `useModelDownload` wraps Tauri invoke/listen for clean component consumption.
|
||||
- [Phase 04-hf-download-engine]: `.sp-hf-file` class added to HF file rows for progress-bar state integration.
|
||||
|
||||
### Pending Todos
|
||||
|
||||
@@ -89,7 +101,7 @@ None yet.
|
||||
|
||||
### Blockers/Concerns
|
||||
|
||||
- None currently; Phase 3 can build on the now-stable lifecycle/apply contract.
|
||||
- None currently; Phase 4 complete and verified.
|
||||
|
||||
### Quick Tasks Completed
|
||||
|
||||
@@ -99,6 +111,6 @@ None yet.
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-03-29T20:49:43.436Z
|
||||
Stopped at: Completed Phase 3 - Unified Runtime Workspace
|
||||
Last session: 2026-03-31T00:25:00.000Z
|
||||
Stopped at: Completed Phase 4 - Hugging Face Download Engine
|
||||
Resume file: None
|
||||
Reference in new issue
Block a user